April 2019 Cases
On April 9, 2019 the HP Board approved the following cases: HP19-01 127 W Main – 1) Repair all structural concerns including the exterior west wall, 2) removing the awning, 3) replacing the broken windows. HP19-02 225 E Main – 1) Add green space in front of the Train Depot, 2) removal and relocation of the gazebo, 3) addition of a railroad container to be used as a non-permanent shelter at the north of the building, 4) addition of railroad viewing timber seating, 5) new sidewalks and pedestrian walkways, 6) custom swing near Caddo Street, 6) moving the Otis Elevator with signage into the park area, 7) adding artwork and free standing sign.